APC P D U User's Guide Page 51

  • Download
  • Add to my manuals
  • Print
  • Page
    / 125
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 50
®
USER’S GUIDE
Switched Rack PDU
48
Scheduling Outlet Actions (Web Interface Only)
Actions you can schedule
For any outlets you select, you can schedule any of the actions listed in the following
table to occur daily; at intervals of one, two, four, or eight weeks; or only once.
To configure values for Power On Delay, Power Off Delay, and
Reboot Duration for each outlet, see Configure outlet settings and the
outlet name. Although you must use the Web interface to schedule
outlet actions, you can set these values in either the Web or control
console interfaces.
For an action to be applied to an outlet group, you must have outlet
groups enabled at the beginning of the scheduled action. For example,
if Off Delayed is scheduled for 4:00 p.m., the Power Off Delay begins
at 4:00 p.m. Even if you then enable outlet groups during that Power
Off Delay before any of the outlets are scheduled to turn off, the
action will be applied only to the individual outlet and not the outlet
group.
Option Description
No Action Do nothing.
On Immediate Apply power to the selected outlets.
On Delayed Apply power to each selected outlet according to its value for Power
On Delay.
Off Immediate Remove power from the selected outlets.
Off Delayed Remove power from each selected outlet according to its value for
Power Off Delay.
If an outlet group is selected, the configured delays and reboot duration of the lowest-
numbered outlet (for a local outlet group) or of the global outlet (for a global outlet group that
is initiating the action) are used.
Page view 50
1 2 ... 46 47 48 49 50 51 52 53 54 55 56 ... 124 125

Comments to this Manuals

No comments