Smart-UPS® VT 10-40 kVA 380/400/415 V - 208/220 V - 200/208 V Installation in Parallel6
1. Route the cables (UPSs apart)
Note: If the UPS system is going to be anchored to the floor, drilling holes for anchoring is
recommended to take place at this stage. See Anchor the UPS Parallel System to the Floor.
Remove the front panel and the top cover. See Remove the front panel and the top cover.
Loosen the two screws from the cable-inlet plates at the bottomxplate of UPS 1 and UPS 2, and remove
the plates.
From UPS 1: Route the two PBus cables to the slots on thexleft side of the enclosure and down inside the
panel.
From the lowest slot fish out the cables from the side panel andxroute them down through the cable inlet
and through the round hole at the bottom.
UPS 1
UPS 2
Parallel
Communication
Box - installed
by the APC
field service
engineer.