APC SMART-UPS 10-40 KVA 380/400/415 V User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
Smart-UPS® VT 10-40 kVA 380/400/415 V - 208/220 V - 200/208 V Installation in Parallel10
3. Route the cables with conduits (UPSs apart - top cabling)
Remove the front panel and the top cover. See Remove
the front panel and the top cover
Remove the conduit plate at the back of the UPS cover
xxand drill holes with center in the small pre-drilled
xxholes. 2 cm (3/4 in) is recommendable for conduits.
Route the ABus and the PBus cables through the conduit holes into the inside of the top cover on UPS 1.
Leave the cables on top of the UPS.
Attach conduits with 2 cm (3/4 in) fittings (not supplied).
Route conduits with PBus cables to UPS 2. Pull the cables through the top cover conduit plate and leave
the cables on top of the UPS as shown.
Attach conduits to UPS 2 with 2 cm (3/4 in) fittings (not supplied).
Run the ABus cables to the Maintenance Bypass Panel (see Maintenance Bypass Panel (MBP) CAN I/O
Board Installation sheet 990-2873).
Note: Proceed the routing of cables into UPS 3 and UPS 4, if applicable.
UPS 2
UPS 1
To next UPS
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 23 24

Comments to this Manuals

No comments