Installation: Vertical Mounting Rails
16 NetShelter VX 25U Enclosure
How to reposition the vertical rails using the horizontal braces
You can reposition the two front, the two rear, or all four vertical rails along the horizontal braces to
accommodate your equipment. You can reposition the vertical rails even if they are configured for
19-inch equipment. The procedure is the same for all of the vertical rails.
1. Remove the side panels.
2. Use the 5-mm hex wrench (provided) to remove the hex-head screws from the slots of the
vertical rails.
3. Locate the new position for the vertical rails.
4. Insert a caged nut into each appropriate hole at the new position on the upper and lower
horizontal braces.
5. Place the mounting rail at the
new position. Insert a hex-head
screw through the rail into the
caged nut, in the upper and
lower horizontal brace. Tighten
the screws to secure the vertical
mounting rail to the horizontal
braces.
6. Repeat steps 2 thru 5 for the
opposite side of the enclosure.
Warn
i
ng
When the vertical rails are attached to the side braces, no more than 1000 lb
(453.6 kg) of equipment should be mounted in the enclosure.
See “How to Remove and Install the Side Panels” on page 9.
Note
If necessary, adjust the position of the horizontal braces up or down to align with
the vertical rails.
See “How to move a brace” on page 17.
See “How to install and remove caged nuts” on page 18.