InRow Half-Rack RC Installation16
Mechanical Connections
Piping
Water. Install shutoff
valves for routine
service and
emergency isolation
of the equipment.
When a cooling
distribution unit
(CDU) is not used,
you must install
circuit setters to
regulate the chilled
water flow for each
InRow RC air
conditioner. See
piping diagrams
beginning on page 8.
Layout and piping
considerations.
Fluid pipes are not
allowed directly
above electrical
equipment. All
piping must be
installed above the
aisles as shown. If
any piping makes a
turn, or must be
routed over electrical
equipment, there
must be a drip tray
under the pipe that
will protect the
equipment from
condensation and
leaks. All piping
must be kept separate
from any electrical
runs or wiring.
Insulation. Insulate water lines to protect personnel and to minimize condensation.
Note: Using either tape or glue, completely seal the insulation boots covering the unused
supply and return connections.
NetShelter NetShelter
PDU
UPS
NetShelter NetShelterNetShelter NetShelter
NetShelter
RC RC
CDU
na1941a
NetShelter NetShelter
NetShelter
NetShelterRC RC NetShelter
NetShelterNetShelter
PDU
UPS
NetShelter
RCRC
NetShelter NetShelter
CDU
Top piping examples shown
Hot Aisle Containment
InRow
Page view 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 43 44

Comments to this Manuals

No comments