InRow Half-Rack RC Installation20
Filling and Purging
When the equipment is properly piped, begin the filling process (top piping configuration shown).
Electrical Hazard: Ensure both electrical connections are disconnected before introducing
water into the equipment.
1. Open the 2-way supply valve and the 2-way bypass shutoff valve.
2. Using a 2.5-mm hex key, turn the flow control actuator to the fully open position.
na1767a
Flow control
actuator
Fully open
Full bypass
Fully open
Fully open
2-way supply
valve
2-way bypass
shutoff valve
Fully closed
Fully closed
Comments to this Manuals