APC AIS 3000 User Manual Page 21

  • Download
  • Add to my manuals
  • Print
  • Page
    / 58
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 20
Site Preparation (UPS and XR) – Installation Space Requirements
AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957 13
Clearance for stand-alone 13.85in/352mm Enclosures
*) All physical installations must comply with NEC 110.26.
(C)
(A)
(D)
Stabilizing Bracket,
left and right
UPS
Conduit Box (F)
(B)
(G)
(E)
Space requirements in mm
Minimum clearance above UPS (A) 20 508
UPS depth (B) 33.62 854
UPS width 13.85 352
Minimum free rear space for ventilation* (D) 4 100
Minimum front clearance (E) 39.37 1000
Conduit Box, depth (F) 3.46 88
No side clearance required (add width of Stabilizing
Bracket for floor anchoring if applicable)*
00
Stabilizing Bracket width 3.34 85
Total installation depth, inclusive of Front Panel, Conduit
Box and minimum front and rear clearances (G)
80.39 2042
Page view 20
1 2 ... 16 17 18 19 20 21 22 23 24 25 26 ... 57 58

Comments to this Manuals

No comments