Electrical Installation – Input/Output Wiring – Dual Mains
AIS® 3000 10-30kVA, 208V, Site Preparation and Installation Manual – 990-1957 35
Punch 3 holes in the Conduit Box bottom to fit the size of the conduit pipes.
Attach the Conduit Box bottom to the Enclosure, using (4) M4x13 screws.
Install conduit pipes in the Conduit Box bottom.
Run cables through the conduit pipes and the bottom of the Conduit Box. Guide the cables up
into the input/output area.
Install the top part of the Conduit Box to the Enclosure.
Remove the (2) M6x12 screws from Brackets A, B, and C and remove all 3 brackets.
Attach the input cable lugs to input busbars L1, L2, L3, using the provided hex screws. Attach
the bypass cable lugs to L1, L2, L3 bypass busbars, using the provided hex screws. Attach the
output cable lugs to the L1, L2, L3 output busbars and attach, using the provided hex screws.
Attach N x 3 where shown., using the provided hex screws.
Attach Ground x 3 where shown.
Reinstall the Plate, following reversed deinstallation procedures (described in a previous step).
N
N
Batt
+
L
1
L
3
L
2
Batt-
N
L
1
L
3
L
2
L
3
L
2
L
1
Ground
Neutral
Input
Bypass
Output
Plate covering cable
termination area