APC Back UPS 1400 VA User Manual Page 12

  • Download
  • Add to my manuals
  • Print
  • Page
    / 31
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 11
8
7. Expand the rail so that it spans from the front rack post
to the back rack post.
8. Use three screws and washers to attach the rail to the
back rack post. Use the same hardware (10-32 flat
head screws and conical washers) used in step 5.
9. Repeat steps 5 through 8 for the other rail.
Attach the Mounting Hardware to the UPS
Each mounting bracket attaches to the UPS with four (4) screws, included.
Two sets of bracket holes are located on the sides of the UPS. Attach the mounting brackets in
the forward position for a four-post rack or the mid-point position for a two-post rack.
Bracket Position for a Four-Post Rack Bracket Position for a Two-Post Rack
If you are using a two-post rack, reposition the mounting brackets to the mid-point
position before mounting the UPS in your rack.
Check the rack to make sure it will not tip after moving the UPS mounting
brackets.
For Four-Post Racks: Attach a mounting cleat to each side of the UPS.
Right Rear Rack Post
Page view 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 30 31

Comments to this Manuals

No comments