20 Smart-UP VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B
Floor Anchoring
Drilling floor holes for floor anchoring
Hole positions for floor anchors (stand-alone Enclosures)
Refer to this drawing for floor anchor positions for 20.59 in/523 mm.
Refer to this drawing for 13.85 in/352 mm.
Note
If floor anchoring is required in your area, read this section. If not, proceed to
Operating Environment. However, if you install a 13.85 in/352 mm Enclosure, it must
always be equipped with the Stabilizing Bracket for enhanced stability (not necessary
to bolt the Stabilizing Bracket to the floor in non-seismic areas).
Note
If the UPS installation requires floor anchoring, the UPS installation must be anchored to
the floor, re-using the brackets that also secured the UPS to the pallets when shipped. For
easy determination of where to drill the holes, refer to the applicable drawings below
indicating hole positions and size.
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm
5.11in/
130mm
5.78in/
147mm
0.92in/
23.5mm
26.3in/575mm 15.9in/404mm
25in/650mm
20.59 in/523 mm Enclosure
13.85 in/352 mm
Enclosure
Rear
Rear
Floor anchor holes:
Ø 10 mm
Floor anchor holes:
Ø 10 mm