40 Smart-UP VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 990-1598B
Wiring Verification Procedure
Use following procedure to verify that the UPS has been wired properly:
Note
Do not connect batteries in the UPS.
1. If your installation includes an XR Enclosure, make sure that the DC breaker (if
available) is in the OFF position and that both 125A fuses are removed from the
XR Enclosure.
2. Check that the power wiring is torqued to 45 lbf
.
in/7Nm.
3. If your installation includes an XR Enclosure, remount the 125A fuses in the XR
Enclosure and check that the DC breaker (if available) on the XR Battery
Enclosure is in the ON position.
4. Please leave a wiring diagram on site for service / technical support personnel.
Note
If a problem occurs, phone Customer Support at (1) (800) 800-4272 (US and Canada).
Refer to rear cover for contact numbers in other countries.
Note
If you have purchased any optional equipment, refer to product-specific manuals.
Note
Start-up must be performed by APC authorized personnel only. Call APC to scedule a
free 5x8 Start-up service.