APC H15 Service Manual Page 41

  • Download
  • Add to my manuals
  • Print
  • Page
    / 86
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 40
Users and Service Guide 5-7
Controlling the Test Set and Making Measurements
Commands
To connect all ports to their internal 50 loads, send the following
command:
NOTE When a test set port is not in use, it is terminated in 50 .
If the Agilent 87050A Option H15 is being controlled by GPIB (HP-IB),
you can read the serial number of the test set by sending the following
commands:
When the RESET command is sent, the test set is set to a known state
where the Reflection port is directed to Port 1 and the Transmission
port is directed to Port 2.
Refer to the Option H15 block diagram, Figure 6-1 on page 6-22, for the
switch paths.
The switch count represents the number of times each switch has been
activated. To read the individual switch count, send the following
command:
The above example shows the SW11 command only. To enter additional
commands use Table 5-2 on page 5-8.
OUTPUT 712;"*all_term;"
OUTPUT 712;"sn?"
ENTER 712:Sn$
DISP Sn$
OUTPUT 712;"SW11?"
ENTER 712; COUNT$
DISP COUNT$
Page view 40
1 2 ... 36 37 38 39 40 41 42 43 44 45 46 ... 85 86

Comments to this Manuals

No comments