Installation Guide APC BC300 Series 40kW 208/450/480V UPS 3
Contents:
1.0 Introduction 4
1.1 Tools and Equipment Needed 4
2.0 Receiving, Unpacking, Moving
and Storing the UPS and Batteries 5
2.1 Receiving, Unpacking and Moving to Site 5
2.2 Storing the UPS and Batteries 5
3.0 Installation 6
3.1 Requirements on Site 6
3.1.1 UPS Footprint (measurements in inches & mm) 7
3.2 Installing the Conduit Connection Kit 7
3.2.1 Conduit Connection Kit Contents 8
3.2.2 Installing Pedestals 8
3.2.3 Installing Conduit Box and Base Covers 8
3.3 Installing the Maintenance Bypass Panel and UPS 9
3.3.1 Component Overview (door open) 11
3.3.2 Wire Terminals 12
3.3.3 Wiring Diagram for BC300 13
3.3.4 Single Line Diagram for BC300 14
3.3.5 External Connection Board 18
3.3.6 Communication Interface Board (Option) 19
3.4 Smart Slot and Connection of Triple Chassis 20
3.5 APC BC300 Triple Chassis 21
3.5.1 Safety Warnings 21
3.5.2 Product Description 21
3.5.3 Installing Management Products 22
3.5.4 Powering the APC BC300 Triple Chassis 23
3.5.5 Troubleshooting 24
3.5.6 Product Specifications 25
3.6 Installation of External Batteries and Battery Breaker 27
3.6.1 Battery Installation 27
3.6.2 Battery Replacement 30
4.0 Initial Start-up and Phase Check 31
4.1 Initial Start-up and Phase Check (External Batteries) 31
5.0 Clearing the Events Log 32
6.0 Start-up and Shutdown Procedure 33
6.1 Start-up from Maintenance Bypass 33
6.2 Shutdown Procedure 33
7.0 Technical Specifications 35
7.1 APC BC300 Series 40 kW Technical Data 35
7.2 Battery Specifications 36
7.3 Dimensions/Weight 36
8.0 How to Contact APC 37