Setting Up the Snap Server 14000
26 Snap Server Administrator Guide
Rack Installation for the Snap Server 14000
Be sure to install the server correctly. The server weighs approximately 75 pounds,
and rack installation requires two or more people. If you have a four-post rack,
Snap Appliance recommends that you use the rear support brackets provided.
Caution
The following procedure applies to standard EIA racks; other racks may
not be able to support the server using only the front post. If you are using a non-
EIA rack, Snap Appliance recommends that you secure the server using slide rails,
available from Snap Appliance or a Snap Appliance reseller.
1
Before installing the rack, make sure you have the following items:
Two (left and right) front rack mounting bracket assemblies (ears)
Four quick-release screw assemblies (knurled head, threaded stud, and plastic
washer)
Sixteen black screws (twelve to attach the front rack mounting bracket
assemblies and four to attach the long rear support brackets to the sides of the
server)
Two long rear support brackets, recommended for use with four-post racks
One Phillips screwdriver
2
Separate the four quick-release screws into component parts (knurled heads,
threaded studs, and plastic washers).
3
Determine the mounting height for the server in the rack, and then mount the
threaded studs from the four quick-release screws into the rack at that height.
4
Attach the front bracket assemblies to the front of the server using twelve of the
black screws provided (six for each front bracket assembly).
5
With at least one other person, temporarily support the server, and align the slots
on the front brackets with the threaded studs of the quick-release screws.