APC AR2802BLK Datasheet Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
NetShelter VX Four-Post Open FrameUsers Manual 13
Installing Equipment
Installing and
removing caged
nuts
During installation of equipment in your frame, you may need
to install or remove caged nuts.
To i n s t al l :
1. Insert the caged nut into the square hole by hooking one
ear of the caged nut assembly through the far side of the
hole.
2. Place the caged nut tool (included) on the other ear of the
caged nut and pull to snap it into position.
To r e m ov e : Remove any attached screw and reverse the action
in step 2. Grasp the caged nut before releasing the tool.
W
arn
i
ng
Install caged nuts horizontally, with the ears
engaging the sides of the square hole. Do NOT
install caged nuts vertically with the ears
engaging the top and bottom of the square
hole.
N
ote
Install the caged nuts on the interior of the
mounting rails.
NS UM 990-0398.book Page 13 Tuesday, February 12, 2002 10:26 AM
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 26 27

Comments to this Manuals

No comments