5
R
ACK MOUNT CONFIGURATION
Refer to the Installation Guide included in Rail Kit SURTRK2 for instructions on mounting the UPS
and the external battery packs into a rack.
NOTE: The external battery packs must be mounted below the UPS in the rack.
Installing and Connecting the External Battery Pack(s)
1. Connect the green/yellow ground wires (screws included), as shown in the diagrams below.
TVSS Ground Wire Connections
2. Connect the rear panel batteries as shown in the diagrams below.
Battery Connections
Comments to this Manuals