APC SUVT10KF2B4S Datasheet Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
990-1598B Smart-UP VT 10-30 kVA, 208/220 V Site Preparation and Installation Manual 17
Site Preparation Checklist
System components. Have you –
Site Preparation. Have you –
Arrival Preparation. Have you –
determined minimum battery run time requirement based on load (kW and kVA) and selected the
proper number of APC XR Enclosures (SUVTBXR2B6S, SUVTXR2B6S and SUVTBXR6B6S,
SUVTXR6B6S) and Battery Unit (SYBT1). Always install a whole Battery Module (4 Battery
Units) at a time.
considered Service Program or Extended Warranty plan?
verified that input voltage and current are available?
considered correct operating space, floor strength (see Installation Space Requirements), cooling,
and environment (see Operating Environment).
reviewed all electrical work to determine wiring requirements?
verified that space and handling equipment are available to receive the UPS/XR Enclosure?
(Including unloading the UPS/XR Enclosure from the delivery truck).
scheduled an authorized electrician to install the UPS/XR Enclosure?
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 47 48

Comments to this Manuals

No comments