2 150 kW InfraStruXure Power Distribution Unit
Warnings
Receiving/moving
Do not tilt the PDU more than 45° from its vertical axis. Never lay the PDU on its side.
Installation/maintenance
Only a certified electrician can:
Connect the PDU to its power source
Connect a switch to the EPO interface on the PDU
Install a customer-specified, hard-wired power cable
Only a certified electrician or an APC field service engineer can perform maintenance on the PDU.
When connecting the PDU to its power source, you must install a circuit breaker to protect the PDU
against over-current conditions. Determine the type of circuit breaker you need to install. If using the
PDU at its full rating, the following circuit breaker sizes are recommended:
Maintenance performed while the PDU is receiving input power
APC does not recommend that you perform maintenance on the PDU while it is receiving input
power. However, due to the critical nature of data center loads, this may occur. If you must perform
maintenance while the PDU is receiving input power, observe the following precautions to reduce the
risk of electric shock:
1. Never work alone.
2. Perform the maintenance only if you are a certified electrician who is trained in the hazards of
live electrical installation.
3. Know the procedure for disconnecting electricity to the PDU and the data center in case of an
emergency.
4. Wear appropriate personal protective equipment.
5. Use double-insulated tools.
6. Always follow local and site regulations when working on the PDU.
Input Voltage Circuit Breaker Size
480 V 250 A
600 V 200 A