APC 150kVA PDU W/ 480 PRI 208/120 SEC K1 XMER Specifications Page 33

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 32
150 kW InfraStruXure Power Distribution Unit 25
Install InfraStruXure Rack-Mount Devices
Install the Rack Automatic Transfer Switches (ATSs)
Install a rack ATS in the top of each enclosure for overhead wiring, and in the bottom of each
enclosure for under-floor wiring.
The rack ATS is an optional component, and is not included with all InfraStruXure systems.
Install the Rack Power Distribution Units (PDUs)
Install rack PDUs in the rear of the NetShelterVX enclosure, in the channel directly behind the rear
vertical mounting rails. For overhead wiring, make sure the power cord is pointing toward the roof of
the enclosure. For under-floor wiring, make sure the power cord is pointing toward the floor.
Install the InfraStruXure Manager and Hub (or Switch)
Install the InfraStruXure Manager in the enclosure located closest to the PDU. The CAT-5 data cables
included with your configuration are of varying lengths, based on the distance components will be
installed from the PDU.
Install the environmental monitoring unit or environmental management system
The environmental monitoring unit and the environmental management system are optional
components, and are not included with all InfraStruXure systems.
See also
See the installation instructions in the manual included with your rack ATS.
See also
See the installation instructions in the manual included with your rack PDU.
See also
See the installation instructions in the manual included with your InfraStruXure
Manager.
See also
See the installation instructions in the manual included with your environmental
monitoring unit or environmental management system.