Installation Procedures: Wiring Under the Floor
30 150 kW InfraStruXure Power Distribution Unit
5. At the distribution panel, cut the power cable to the proper length and connect the individual
wires:
a. If branch current monitoring is installed, route each phase conductor through a current
sensor. If using three-phase cable, route the L1, L2, and L3 wires through a separate current
sensor.
b. Connect the L1, L2, and L3 wires to the circuit breaker(s). The following illustration shows a
three-phase cable connecting to three single-pole breakers; however, you can also connect a
three-phase cable to a three-pole breaker, or a single-phase cable to a single-pole breaker.
c. Connect the neutral wire to the closest open termination point on the Neutral Bar (N).
d. Connect the ground wire to the closest open termination point on the Ground Bar (G).
The following table provides specific information about connecting to each terminal.
Terminal Copper Conductor Size (AWG) Torque Tool
L1, L2, L3 8, 10, 12 36 lb-in (4 Nm) Slotted screwdriver
N, G 8, 10, 12 20 lb-in (2.3 Nm) Slotted screwdriver
Note
Any customer-specified, hard-wired, multi-circuit power cable that is installed by
an electrical contractor must include a circuit breaker which provides both
automatic and manual disconnection of all non-grounded circuit conductors.
G
N
Page view 37