APC 150kVA PDU W/ 480 PRI 208/120 SEC K1 XMER Specifications Page 26

  • Download
  • Add to my manuals
  • Print
  • Page
    / 56
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 25
Installation Procedures: Connect an Emergency Power Off Switch
18 150 kW InfraStruXure Power Distribution Unit
Connect an EPO switch to the user connection plate and test the switch
1. Connect the switch to the appropriate EPO connection points in the terminal block on the user
connection plate. Read the label next to the terminal block to determine which connection
points apply to your signal type:
Contact Closure—Normally Open
Contact Closure—Normally Closed
24 VAC/VDC—Normally Open
2. Verify that the EPO DIP switches on the PDU monitoring unit are configured properly for your
signal type. The labels above the switches and the figure below show the correct settings for
both the Normally Open (NO) and Normally Closed (NC) positions.
Note
The default setting on the EPO interface is for a Normally Open (NO) switch.
1 234
ATS EN
ATS 0
AT S 1
ATS 2
EPO
Contact
– +
EPO 24V
AC/DC
Contact Inputs
Contact Outputs
USER INTERFACE
© 2001 APC
MADE IN USA
External Set of
Normally Open Dry Contacts
1 234
ATS EN
ATS 0
ATS 1
ATS 2
EPO
Contact
– +
EPO 24V
AC/DC
Contact Inputs
Contact Outputs
USER INTERFACE
© 2001 APC
MADE IN USA
External Set of
Normally Closed Dry Contacts
1 234
ATS EN
ATS 0
AT S 1
ATS 2
EPO
Contact
– +
EPO 24V
AC/DC
Contact Inputs
Contact Outputs
USER INTERFACE
© 2001 APC
MADE IN USA
External Set of Normally Open Dry Contacts
24 V AC or DC Power Supply
NO
NC
TRIPPED
ARMED
TEST
EPO
Normally ClosedNormally Open
or 24V AC/DC
Location of switches
on PDU monitoring unit
Page view 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 55 56

Comments to this Manuals

No comments