150 kW InfraStruXure Power Distribution Unit 17
Connect an Emergency Power Off Switch
Overview
Connecting the switch. The
Emergency Power Off (EPO) switch
connects to the user connection plate. The
figure on the right shows the location of
the user connection plate on the roof of the
PDU. Three types of EPO connections are
available on this plate:
Contact closure
•24 VAC
24 VDC
Configuring and testing. Configuring and
testing of the switch is done through the EPO
interface on the PDU monitoring unit. The
figure on the right shows the PDU monitoring
unit and the location of the EPO LEDs and DIP
switches.
Note
APC offers an optional InfraStruXure EPO system (EPW9). Contact your APC sales
representative or visit the APC Web site (www.apc.com) for more information.
Caution
If you are not connecting an emergency power off switch to the PDU, leave the
Arm/Test rocker switch on the PDU monitoring unit in the Test position.
Note
The PDU monitoring unit provides the EPO function. The purpose of this function
is to activate any shunt trips controlled by the PDU monitoring unit in emergency
situations. Shunt trips are present on the main input breaker of the PDU and on
breakers that support the power source feeding the PDU.
Note
Contact closure is recommended.
1 234
ATS E N
ATS 0
AT S 1
ATS 2
EPO
Contact
– +
EPO 24 V
AC/D C
Contact Inputs
Contact Outp uts
USER INTERFACE
© 2001 APC