APC InfraStruxure Specifications Page 23

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 22
Installation Procedures: Connect the Power Source to the PDU
InfraStruXure System—Installation and Start-Up 15
In the top of the PDU for overhead wiring
2. Cut an appropriately-sized hole in the gland plate for the conduit.
3. Re-attach the gland plate.
4. Install a lock-nut and bushing to the conduit.
5. Thread the conduit through the hole.
Page view 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 59 60

Comments to this Manuals

No comments