APC InfraStruxure Specifications Page 32

  • Download
  • Add to my manuals
  • Print
  • Page
    / 60
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 31
24 InfraStruXure System—Installation and Start-Up
Install Shielding Troughs, Shielding Partitions,
and Cable Ladders
Shielding Troughs and Shielding Partitions for overhead wiring along rows
If you ordered APC Shielding Troughs, Shielding Partitions, and Cable Ladders to route overhead
wiring for your system, assemble the Shielding Troughs and the Shielding Partitions along the rows
of enclosures and assemble the Cable Ladders between rows
Shielding Troughs. There are two types of Shielding Troughs:
Shielding Trough accessories. APC offers the following accessories for Shielding Troughs:
See als
o
For detailed installation and grounding instructions, see the instruction sheet
included with the Shielding Troughs and Shielding Partitions
(990-1393B).
The PDU Wide Shielding Trough is 610mm in length and is not adjustable. The trough sits on
top of the PDU and accommodates power cables as they exit the roof of the PDU. The PDU
Shielding Trough is two pieces. The power cables sit in between the two pieces when installed
on the roof of the PDU.
The NetShelter Shielding Trough is 610mm in length and is not adjustable. The Shielding
Troughs haves an opening in each side through which you route data cables to the Shielding
Partitions.
Shielding Trough Covers for both 600-mm wide (AR8174BLK) and 750-mm wide
(AR8175BLK) enclosures. Contact APC for more information.
Shielding Trough End Caps (AR8167BLK) to place on the side of a Shielding Trough at the
end of a row. Contact APC for more information.
Page view 31
1 2 ... 27 28 29 30 31 32 33 34 35 36 37 ... 59 60

Comments to this Manuals

No comments