990-3017A-001 Symmetra PX 160 kW 400 V Installation 19
Power Cables
How to Connect Cables between the UPS and
the PDU-XR
APC recommends installing a 45º cable lug. If you do not use a 45º cable lug, install a busbar
safety bracket between each busbar and cable lug to ensure a safe distance with straight cable
lugs. The brackets are provided with the UPS.
Note: Do not remove the 12 pcs M10 nylon hex bolts from the busbars. Mount the cables in
the open holes.
Caution: Ensure clockwise phase rotation and neutral location. The power terminal bolt
diameter is 10 mm. The required torque value is 26 Nm.