Power Cables: How to Connect Cables between the UPS and the PDU-XR
20 Symmetra PX 160 kW 400 V Installation 990-3017A-001
Before running the cables, loosen the three bolts on each cable relief next to the PDU.
Route the cables to the UPS through the holes in the cable relief on the side of the enclosure starting
from the bottom with the bypass L3 and then working your way up. Lay the cables neatly to
minimize cable build-up. Do not tie the cables up.
Mount the cables to the busbars according to the labels.
Tighten the three bolts on each cable relief.
Cables from the PDU-XR
Back of the UPS
Mains:
Output:
Bypass:
Neutral
Mains L2
Mains L1
Mains L3
Neutral
Output L2
Output L1
Output L3
Neutral
Bypass L2
Bypass L1
Bypass L3
BAT +
BAT -
CT (Midpoint)
BAT:
L3
L2
L1
Neutral
L3
L2
L1
Neutral
L3
L2
L1
Neutral
BAT +
BAT -
CT (Midpoint)
Cable relief
Side view of the UPS