APC AR2802BLK Datasheet Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 27
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
NetShelter VX Four-Post Open FrameUsers Manual 5
Before Installation
Location of
mounting
hardware
The bag containing the mounting hardware is fastened to the
floor of the frame.
Tools required The following tools (not included) will be necessary to unpack
and adjust the frame:
Phillips screwdriver
Shears/utility knife
•Level
W
arn
i
ng
Before you begin to unpack the frame, read and
follow these warnings to prevent injury and
damage:
Use at least two persons to unpack the
frame.
Stabilize the frame before installing the
components—failure to do so could allow
the frame to tip over.
Do not extend more than one component
from the frame at one time to prevent the
frame from becoming dangerously
unstable.
Load the heaviest components first and
place them toward the bottom of the
enclosure to prevent the frame from
becoming top-heavy.
NS UM 990-0398.book Page 5 Tuesday, February 12, 2002 10:26 AM
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 26 27

Comments to this Manuals

No comments