APC Battery Management System User Manual Page 151

  • Download
  • Add to my manuals
  • Print
  • Page
    / 194
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 150
®
USER’S GUIDE
Battery Management System
144
Load the host key to the Management Card on the Battery
Management System master controller.
Perform these steps:
1. On the Network menu of the Web interface of the Battery
Management System, select the Telnet/SSH option.
2. In the SSH User Host Key File section of the page, browse to the host
key, the .p15 file you created in the procedure Create the host key.
(The default location is C:\Program Files\American Power
Conversion\APC Security Wizard.)
3. On the SSH Host Key Fingerprint section of the page, note the
fingerprint for the version (or versions) of SSH you are using. Log on to
the Battery Management System through your SSH client program,
and verify that the correct host key was uploaded by verifying that
these fingerprints match the fingerprints that the client program
displays.
Alternatively, you can use FTP or Secure CoPy (SCP) to transfer
the host key file to the Management Card. You must specify the
correct location, \sec, on the Management Card. For SCP, the
command to transfer a host key named hostkey.p15 to a
Management Card with an IP address of 156.205.6.185 would
be:
scp cert.p15 [email protected]:\sec\hostkey.p15
Page view 150
1 2 ... 146 147 148 149 150 151 152 153 154 155 156 ... 193 194

Comments to this Manuals

No comments