Apc GALAXY 7000 User Manual Page 43

  • Download
  • Add to my manuals
  • Print
  • Page
    / 64
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 42
Connecting the power cables > SSC maintenance cabinet
34020846EN/AD - Page 43
1. Installation
2000 kVA
This operation may only be carried out by authorized staff.
The door must be opened using the Ronis 405 key.
Key:
(1) Front face protective covers
(2) Roof protective covers
(3) Earth bar
(4) To Earth
(5) To the load
(6) To the SSC
(7) To the UPS
1 - Remove protective covers (1) and/
or (2).
Connect the cables
This operation may only be carried out by authorized staff.
See “Characteristics of the connection terminals”, page 21.
1 -Check switches Q3BP ext (1) and
Q5N ext (2) are in the OFF position as
shown opposite.
2 - Connect the protective conductor
(PE or PEN) to the earth bar
3 - Connect the UPS conductors in the
following order: L1, L2, L3
4 - Connect the AC Bypass
conductors in the following order: L1,
L2, L3
5 - Connect the load conductors in the
following order: L1, L2, L3
6 - Refit the protective covers
A
A
7
7
6
6
45
3
2 2
OFF
OFF
1 1
3
Top entry
Bottom entry
Right side view
Front view
Front
Top view
view
.
Load NS UPS Earth
N L1 L2 L3
650
1550
Q3BP
ext
N
L1 L2 L3
Q5N
ext
1230
L3L1 N L2
OFF
OFF
Page view 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 63 64

Comments to this Manuals

No comments