APC G5USV040P005SAIO Datasheet Page 38

  • Download
  • Add to my manuals
  • Print
  • Page
    / 68
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 37
34001813EN/AF - Page 38
2. Installation
2.16 Power connections for an external battery cabinet
The earth on an external battery cabinet must be connected to the UPS
2.17 Assembly and connection of an empty battery cabinet
Mounting the battery circuit breaker kit
The coil control wires and the position contact wires of circuit-breaker QF1 must be connected to the UPS (see page
24).
You must install Temperature sensor to obtain battery warranty and to optimize battery lifetime.
Secure:
1 - The base plate (60) supporting the circuit
breaker.
2 - Connector XR1.
3 - The temperature sensor (3).
4 - The front plate (4), after connecting the
batteries to the circuit breaker.
Only one circuit breaker is necessary even if
there are several battery cabinets.
Please contact our Sales department when
selecting the battery circuit breaker.
Q1 Q4S Q3BP Q5N
1
+
-
x4
x2
4
60
XR1
3
Page view 37
1 2 ... 33 34 35 36 37 38 39 40 41 42 43 ... 67 68

Comments to this Manuals

No comments