APC SUDP8000IX194 Datasheet Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
990-1007A, Revision 2 9/99
11
UPS
NL NL
INPUT
CABLE
SBP
MAINS
L
N
PE
LOAD
L
N
OUTPUT
CABLE
SBP
SBP
L
N
L
N
Input
cable
UPS
Output
cable
UPS
Fm Fo
1 2 3 4
MBS CONTROL
SBP
CABLE
X010
1 2 3 4
External Service Bypass Panel and Galvanic Isolation Transformer
If both the external service bypass panel and the galvanic isolation transformer are installed, the following connections
must be made:
If the cables in the galvanic isolation transformer have 4 wires, the wire marked no. 3 must be cut off.
If Smart-UPS DP has an ohm load, then it is necessary to ensure the system with 20A. In this case, an external
manual bypass switch which is supplied with a 32A CEE plug, should be used. The switch can ensure both 20A
and 32A fuses.
SBP and Galvanic Isolation Transformer Connections
Standard System With Isolating Transformer (230 V) And SBP
System Mains Fuse*
(Fm)
Input Cable
Transformer
Input Cable SBP Input Cable UPS
4kV 25A 3x6 m 3x6 m 3x6 m
6kV 40A 3x10 m 3x10 m 3x10 m
8kV 50A 3x16 m 3x16 m 3x16 m
10kV 63A 3x16 m 3x16 m 3x16 m
*Din gl Types
System Output Cable UPS Output Fuse SBP (Fo) Output Cable SBP
4kV 3x4 m 20A 3x4 mm²
6kV 3x10 m 32A 3x10 m
8kV 3x10 m 40A 3x10 m
10kV 3x16 m 50A 3x16 m
MAINS
L
N
PE
Input
Cable Tr.
Iso.Tr
.
L
N
Tr. Sw. cable
L
N
UPS
NL NL
INPUT
CABLE
SBP
LOAD
L
N
OUTPUT
CABLE
SBP
SBP
L
N
L
N
Input
cable
UPS
Output
cable
UPS
1 2 3 4
MBS CONTROL
SBP
CABLE
X010
1 2 3 4
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 23 24

Comments to this Manuals

No comments