Chapter 4 Subsystem Connection and Operation
4.3.2 Power On Procedure
When powering on the Falcon subsystem, please follow these steps.
1. Power on the JBOD(s) or cascaded subsystem(s).
If any of the subsystems have been connected to a JBOD or cascaded subsystem, the
JBOD or cascaded subsystem must be powered on first. Please refer to the
instruction manual that came with the JBOD to see its own power on procedure.
2. Power on the main subsystem.
The Falcon subsystem should only be powered on after all the JBODs or cascaded
subsystems have been powered on first. The power on procedure for the Falcon
subsystem is described below.
3. Power on the application servers.
The application servers or host computers should be the last devices that are turned
on. Please refer to the instructions that came with your application servers to see
their own power on procedures.
4.3.3 Falcon Power On Procedure
To power on the subsystem, turn on the only power switch located on the rear center of
the subsystem. (See Figure 4-12) The power switch controls all three PSUs. Once it is
switched on, all PSUs will be functional.
Figure 4-12: Falcon Subsystem Power Switch
Power On 4-11