APC SURT15KRMXLI + Service Bundle 3 Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 31
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
SURT15k/20k 230 VAC Stack/Rack-Mount 6U XLI/XLICH/XLI-CC4
Stack configuration
The UPS and the XLBPs must be connected with ground wires. Refer to the XLBP user manual for details.
Rack-mount configuration
Install rails in rack
For details on rail installation refer to the instructions included in the rail kit package.
Install rack-mount brackets
Four flat head screws must be used to secure each
rack-mount bracket to the unit.
Install rail cleats
Two pan head screws must be used to secure each rail cleat
to the unit.
8x
suo0663a
Always place the UPS above the XLBP(s) in a stack
configuration.
Total stack configuration height is recommended NOT to exceed
18U. This is the equivalent of two XLBPs and one UPS.
Four screws must be used to secure each tie bracket to the units,
(see diagram).
For detailed instructions on installing batteries, the battery
doors, refer to the Rack-mount configuration section of this
manual.
Refer to the Rack-mount configuration section in this manual for
cable routing and bezel installation details.
Tie Brackets
(included with XLBP)
4x
suo0664a
2x
suo0665a
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 30 31

Comments to this Manuals

No comments