Determine cooling and heating requirements at design
1.
conditions:
Site Data:
Required Heating Capacity 68,000 Btu/hr
(Based on Design temperature = 0°F)
Required Cooling Capacity 36,000 Btu/hr
(Based on existing 3-Ton system design)
Select system based on required heating capacity:
2.
See table for proper system size and select WAJ080-
N00A with Heating Capacity of 76,000 Btu/hr.
Site Evaluation
3.
Evaluate following system components after selecting
ring rate for system:
Ductwork: Properly sized for new air ow &
distribution at MCHP Mode & furnace Heat Mode
Smart Zone Thermostat Location: Locate Smart
Zone in large zone in close proximity of freewatt
®
PLUS System. Will facilitate installation of 10
conductor cable from thermostat to system.
Make-Up Air Calculation : Ensure Honda MCHP has
adequate make-up air for its 27,000 Btu/hr ring
rate.
Electrical Requirements : Ensure main electrical
panel has two open breaker slots for 240 VAC MCHP
breaker.
Utility Requirements : Grid interconnection, net
metering and disconnect switch requirements
differ from utility to utility. Review your utility’s
requirements and how they impact installation.
Condensate Removal : Furnace and Honda MCHP
create condensate drain for this uid is required.
Follow local codes for condensate removal.
Internet Connection• : freewatt
®
System control
module is internet-ready and has embedded
web-page. Remote monitoring of system can be
performed by ECR International.
Heat Rejection System : Evaluate whether water
cooled or air cooled heat rejection system (HRS) is
applicable for site and logistics involved with their
installation. The air cooled HRS is located outdoors
and the water cooled HRS is located indoors. Refer
to section 6 for additional details.
Load Selection
4.
Select up to six (6) loads to be placed on APC UTS6H
back-up panel. Loads need to be 120 VAC and each
load should be less than 15 amps. Sheets on following
pages outline circuit plan for back-up panel.
Ensure each load be on dedicated circuit, and total load
of each circuit is known to be less than 15 amps.
Required loads for this panel include:
Furnace (Hot Air) [ freewatt
®
PLUS System]
Suggested additional loads for this panel include:
Lighting Circuit
Garage Door Opener (Low Power)
Freezer
Air Conditioner [Low Power, Dedicated 120 VAC
circuit]
None (If less than 6 loads required)
Other (Computer/TV/Radio)
Sump Pump (Low Power)
Sprinkler System
Security System
Refrigerator [NAECA 2001 Compliant recommended]
Well Pump [Low Power, 120 VAC]
Microwave Oven (Low Power)
Backup Power Source
5.
Next level of selection is backup power source, the
Honda MCHP. Honda MCHP provides 1,800 watts of
power in backup power mode, however only 1,700
watts is available to serve connected loads due to the
100 Watt power consumption of the load balancing
transformer. The Honda MCHP should be placed in
BACKUP1 Power Source Con guration.
freewatt
®
PLUS System has approximately 90 second
delay before power is supplied to back up loads.
Homeowner has option to connect Uninterruptible
Power Supply (UPS) to APC UTS6H and allow selected
loads to have power throughout power outage. If UPS
is included in system design, recommend computer,
SELECTION EXAMPLE