APC Network Management Card AP9619 User Manual Page 13

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 12
UPS Overview – Navigation
990-2819 Smart-UPS® VT ISX 20-30 kVA, 208/220/480V Operation 9
Frequencies.
Utility frequency, bypass frequency and output frequency in Hertz (Hz).
Load and batteries.
Load: Percentage of the load in relation to the total UPS capacity.
Bat Voltage: shows either the positive or negative half of the battery voltage (the lower value of the
two will appear).
Bat Cap: Percentage charge on the batteries in relation to the total battery capacity.
Runtime: The predicted runtime at the current load.
Batteries.
Bat AmpHr: Battery capacity, including both external and internal batteries.
UPS Temp: The highest external battery temperature.
Alarm thresholds.
Load: An alarm will be set when the load is above the threshold level.
Runtime: An alarm will be set when the runtime is below the threshold level.
Clock set-up
From the Setup screen on the Main Menu, you can change the date and the clock setting. From the
Settings screen, select Clock, and press ENTER. A date and a time line will appear.
Time.
The clock function is used to time-stamp events in the event log. To avoid inaccuracies, change the
clock-setting at e.g. daylight-saving time.
Date
To change the date, press ENTER (the day field will become active). Press the UP/DOWN
arrow to select the desired date.
To change the month and the year, follow the same procedures.
Press ENTER to confirm the new settings, or ESC to cancel.
Control
Status
Setup
Logging
Display
Diags
Help
Main Menu
Page view 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 33 34

Comments to this Manuals

No comments