APC Switched Rack Power Distribution Unit (PDU) User's Guide Page 70

  • Download
  • Add to my manuals
  • Print
  • Page
    / 130
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 69
61Metered-by-Outlet With Switching Rack PDU User Guide
Configure the Name and Location of the Rack PDU
Path: Device Manager > Device Load
The name and location you enter appear on the Home tab.
Note: You can set the Name and Location through either the Device Manager tab or the Administration
tab. A change in one affects the other.
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Enter a name and location.
3. Click Apply.
Set the Coldstart Delay for the Rack PDU
Path: Device Manager > Device Load
The Coldstart Delay is the number of seconds added to each outlet’s Power On Delay before an outlet
will turn on after power is applied to the Rack PDU. Allowed values are from 1 to 300 seconds,
Immediate, or Never (never turn on).
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Make a selection for Coldstart Delay.
3. Click Apply.
Reset Peak Load and kWh
Path: Device Manager > Device Load
1. Click the Device Manager tab, then device load from the Load Management menu.
2. Click the Peak Load and Kilowatt-Hours check boxes as desired.
3. Click Apply.
Path: Device Manager > Outlet Load
1. Click the Device Manager tab, then outlet load from the Load Management menu.
2. Select check boxes for Reset peak load values and Reset kWh values as desired.
3. Click Apply.
Page view 69
1 2 ... 65 66 67 68 69 70 71 72 73 74 75 ... 129 130

Comments to this Manuals

No comments