67Metered-by-Outlet With Switching Rack PDU User Guide
Verify your setup and configuration for global outlet groups
To ensure that your setup meets all system requirements for outlet groups and that you have configured
the outlet groups correctly, select Information from the Outlet Groups left navigation menu in the Web
interface to view the groups and their connections:
The Configure Group table displays the following:
– All configured outlet groups on the current Rack PDU.
The outlets in each group by outlet number.
Any outlet groups on other Rack PDUs with which a global outlet group is synchronized. Each
Rack PDU is identified by its IP address if using network mode, or Display ID if using
Network Port Sharing over In/Out ports. Each global outlet is displayed in bold text.
The Global Outlet Overview section displays the following:
The IP address or Display ID of the current Rack PDU.
The IP address or Display ID of any Rack PDUs that contain global outlets that are available
to be synchronized with outlet groups on other Rack PDUs.
– All global outlets configured on the Rack PDUs, regardless of whether they are synchronized
with outlet groups on the current Rack PDU.
Outlet Settings for Outlets and Outlet Groups
Initiate a control action
Note: If you apply an outlet control action to outlets or outlet groups, the following delays are used for
the action:
For an individual outlet (not in an outlet group), the action uses the delay periods and reboot
duration configured for that outlet.
For a global outlet group, the action uses the delay periods and reboot duration configured for the
global outlet.
For a local outlet group, the action uses the delay periods configured for the lowest-numbered
outlet in the group.
To control the outlets on your Rack PDU:
1. From the Device Manager tab, select Control from the left navigation menu.
2. Mark the checkboxes for each individual outlet or outlet group to control, or select the All
Outlets checkbox.
3. Select a Control Action from the list, and click Next >>. On the confirmation page that explains
the action, choose to apply or cancel it.