APC AR2800BLK Datasheet Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 40
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
26 NetShelter VS Enclosure
How to Move the Baying Hardware
Baying trim
The baying hardware is pre-installed on both sides of the enclosure
without sides. The baying trim is pre-installed on the front-right post
of the enclosure without sides, using the baying brackets. When joining
an enclosure with sides to an enclosure without sides, you will need to
move some of the baying hardware.
The procedures for moving baying hardware vary according to whether
the enclosure with sides is to the right or left of the enclosure without
sides. If the enclosure with sides is on the right, you do not move the trim.
When the enclosure with side panels is on the left
1. Carefully slide the enclosures apart.
2. Remove the right side panel of the enclosure with sides.
3. Remove the pan-head socket
screws and nuts that hold the
baying brackets to the front-right
vertical frame of the enclosure on
the right. Leave the baying trim
attached to the brackets. Save the
two pan-head socket screws and
nuts for use in the next step.
Note
When a procedure refers to an enclosure on the right or an enclosure on the left, the
point of orientation is always from the front.
See “How to Remove and Install the Side Panels” on page 11.
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 39 40

Comments to this Manuals

No comments