24 Smart-UPS® VT 10-40kVA 400V Site Preparation and Installation Manual 990-2283
Site Preparation Checklist
System components. Have you –
Site Preparation. Have you –
Arrival Preparation. Have you –
considered Service Program or Extended Warranty plan?
verified that input voltage and current are available?
considered correct operating space, floor strength (see “Installation Space Requirements” on
page 13), cooling, and environment (see “Operating Environment” on page 15).
reviewed all electrical work to determine wiring requirements?
verified that space and handling equipment are available to receive the UPS? (Including
unloading the UPS from the delivery truck).
scheduled an authorized electrician to install the UPS?