APC Automatic Disconnect Switch Specifications Page 29

  • Download
  • Add to my manuals
  • Print
  • Page
    / 102
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 28
Automatic Transfer Switch with Power Distribution 19
Operation
Automatic Operation
How to place the InfraStruXure Power Generation System in automatic operation
1. Ensure that utility mains is available. The generator will be signaled to start if utility mains is
not available.
2. Ensure that the
/Manual/Auto switch on the generator control panel is in the Auto position.
3. Set the ATS Automatic Operation switch to Enable.
4. Check that the Not In Automatic Operation LED is not lit. See page 21 for information on
uncommon behavior of this LED.
“How the InfraStruXure Power Generation System Operates,” beginning on page 6,
provides a detailed summary of automatic operation of the InfraStruXure Power
Generation System.
Page view 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 101 102

Comments to this Manuals

No comments