APC AR2316BLK Datasheet Page 30

  • Download
  • Add to my manuals
  • Print
  • Page
    / 42
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 29
26 NetShelter VX Enclosure: Unpacking, Installation, Customization
Cable Management
Location of cable access openings
There are cable access openings in the roof
, sides
, and base
of the enclosure. When the
NetShelter VX Wide Enclosure is configured for 19-inch EIA equipment, there is also cable access
on the mounting rails
. The rear cabling channel on the back of the enclosure provides clearance
for wiring between the doors and the mounting rails. You can use the clearance between the rear
mounting rails and rear door for routing data and power cablesdata on one side, and power on the
other side.
Before routing wires through the side access holes on the enclosure with sides, ensure the protective
grommets (included) are installed into the cable access openings.
NetShelter VX NetShelter VX Wide
Page view 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 41 42

Comments to this Manuals

No comments