APC NETWORKAIR ACPA4000 User Manual Page 20

  • Download
  • Add to my manuals
  • Print
  • Page
    / 48
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 19
14 NetworkAIR
®
ACPA4000 User Manual
Start-Up
Start-up checklist
Before starting the unit, check to see that the following conditions are met:
All electrical connections have been made to local codes and safety standards.
All accessories and duct work have been installed.
Air flow to and from the unit is not blocked.
Condenser drain is connected and not kinked or pinched.
How to apply power to the unit
Insert the IEC 320 C19 connector of the power cord into the back of the unit. Insert the opposite end
of the power cord, a NEMA 5-20 plug, into the wall outlet.
Electrical
Hazard
Do not use an extension cord with this unit.
Note
The unit will wait three minutes before engaging the compressor if the unit has been
unplugged or has been off for less than three minutes.
Warning
Route the power cord and the condensate line to prevent accidental injury to people
or damage to the unit.
Page view 19
1 2 ... 15 16 17 18 19 20 21 22 23 24 25 ... 47 48

Comments to this Manuals

No comments