Smart-UPS C 1000/1500 VA 120 Vac Tower 3
Operation
Connect Equipment to the UPS
Note: The UPS will charge to 90% capacity in the first three hours of normal operation.
Do not expect full battery runtime capability during this initial charge period.
1. Connect equipment to the UPS.
2. Connect the UPS to the building utility power. Connect the UPS to a two-pole, three-wire,
grounded source only.
USB port: Connect to a computer to use power management software.
Serial port: Connect a serial port cable (not supplied) to use power management
software.
Ground Screw: Connect the ground leads on transient voltage devices to the
chassis ground screw(s), located on the rear panel of the UPS.
Comments to this Manuals