Characteristics (cont.)
The table opposite serves as an
example for an installation comprising
up to four frequency converters or four
parallel UPSs with a centralised SSC.
for installations with redundant units,
take into account only the units
required to supply the load power
(e.g. for an installation made up of 3
parallel-connected rectifier-inverter
cubicles, one being redundant, only 2
rectifier-inverter cubicles are used to
determine Mains 2 and load currents
and cable cross-sections);
this table has been drawn up for
rated phase-to-phase Mains 2 and load
voltages of 415V and full rated load
with a power factor of 0.8. For voltages
of 380 or 400V, multiply the indicated
currents by 1.09 and 1.04 respectively,
then modify the cable cross-sections
accordingly if necessary.
The cable cross-sections in this table
are for the parts illustrated in bold on
the following block diagrams
(installation examples, figures 1 and 2).
Parameters for Mains 2 and load cables for an installation comprising
frequency converters or parallel UPSs with a centralised SSC.
rated inverter number of total UPS Mains 2 or load cable cross-section (1)
output parallel-connected rated output line current in mm
2
in kVA inverters in kVA in Amps Copper Aluminium
250 2 500 722 2 x 185 2 x 300
3 750 1082 3 x 300 4 x 240
4 1000 1444 4 x 240 4 x 400
300 2 600 866 2 x 240 4 x 185
3 900 1299 4 x 240 4 x 400
4 1200 1732 Please consult us*
400 2 800 1298 4 x 185 4 x 300
3 1200 1947 Please consult us*
4 1600 2596 Please consult us*
450 2 900 1154 4 x 240 4 x 400
3 1350 1731 Please consult us*
4 1800 2308 Please consult us*
500 2 1000 1444 4 x 240 4 x 400
3 1500 2164 Please consult us*
4 2000 2888 Please consult us*
600 2 1200 1731 Please consult us*
3 1800 2598 Please consult us*
4 2400 3462 Please consult us*
Fig. 1
Fig. 2
mains 1
load
mains 1
mains 1
inverter 1
inverter 2
inverter 3
Installation with parallel UPSs with a centralised SSC
Installation with parallel frequency converters
(1) cable cross-sections are given for copper
conductors of the U1000 R02V type. They are
calculated according to permissible temperature
rise and allow for line voltage drops over a
mains 1
load
mains 1
mains 1
inverter 1
inverter 2
inverter 3
mains 2
static
switch
cubicle
NF C 15-100 authorizes a maximum of 4
cables per phase.
maximum length of 100 m. For greater lengths,
the cross-sections should be chosen to limit
voltage drops to 3%.