Electrical Installation – Communication Wiring to EPO and Optional Equipment
38 Smart-UPS® VT 10-40kVA 400V Site Preparation and Installation Manual 990-2283
Pin connections J106 for Battery Temperature Sensor, APC Maintenance Bypass
Panel, and Generator Control wiring
Pins 1 through 4 are for battery measurement (only through external temperature sensor).
Pins 5 & 6 are for external maintenance bypass Q3. When Q3 is closed, signals are fed back to the
UPS controller.
Pins 7 & 8 are for external charge control. When 7 & 8 are closed, the UPS charges batteries with a
pre-defined percentage (0-100%) of the maximum charging power. To be used in generator
applications, or if special codes require control of charging.
See “Connecting the APC Battery Temperature Sensor” on page 42.
Note
When connecting the Q3 auxiliary signal, use gold-plated N/C auxiliary switch on Q3.
8
7
6
5
4
3
2
1
J106
Q3
switch
Charging control switch
J1 (Temperature Sensor)
4
3
2
1