System Operation
40kW InfraStruXure PDU—Operation and Configuration 39
7. Read the messages displayed on the UPS display interface:
a. Note any alarms, and verify that they are appropriate
for start-up conditions.
b. Verify that the UPS accepts the input.
Top-Level Status Screen
8. Command the UPS to apply power to the load:
a. Press the
E
SC
key at the top-level status screen to open
the top-level menu and have access to eight submenus.
b. Select Control, and press the
E
NTER
key.
Top-Level Menu
c. Select Tu rn Load O n from the Control menu, and
press the
E
NTER
key.
Control Menu
d. On the next screen select Yes, UPS Load ON, and
press the
E
NTER
key.
Confirmation Screen
The LOAD ON LED illuminates, and the interface displays the following two screens:
Fuel%
Load%
Runtime:
||||||||||||
|||
1hr 2m
In 400V out000V 50Hz
Control
Status
Setup
Accessories
Logging
Display
Diags
Help
UPS Into Bypass
Do Self Test
Simulate Power Fail
Graceful Reboot
Graceful Turn Off
Start Runtime Cal
Turn Load On
Confirm
Yes, UPS Load ON
No, Abort
UPS has been
commanded to turn
load power on...
UPS load is on
Press any key...