APC SMART-UPS 10-40 KVA 380/400/415 V User Manual Page 5

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 4
1Smart-UPS® VT 10-40 kVA 380/400/415 V - 208/220 V - 200/208 V Installation in Parallel
Safety
IMPORTANT SAFETY INSTRUCTIONS
- SAVE THESE INSTRUCTIONS
Warning: ALL safety instructions in the Safety Sheet (990-2822) must be read,
understood and followed prior to installation. Failure to do so could result in equipment
damage, serious injury, or death.
Warning: Parallel operation is not available when the system is set up for 3-wire
operation, which only applies to Japanese systems.
Caution: All electrical power and power control wiring must be installed by a qualified
electrician, and must comply with local and national regulations for maximum power rating.
Note: The cables must be routed by the electrician but not attached. The APC Field Service
Engineer will install the parallel communication box and attach all cables to the UPSs.
Note: Up to four UPS units can run in parallel.
See also:
For information on UPS specifications on the Smart-UPS VT series, see part nos. (available
from the document storage in the UPS):
• 990-1986 — 380/400/415 V
• 990-1598 — 208/220 V
• 990-2360 — 200/208 V
Parallel Communication Cables
Three different ways of routing cables
Note: The enclosures in a parallel system can be kept apart, or they can be assembled with
interconnection plates (SUVTOPT011 APC Smart-UPS VT Parallel Operation Baying Kit). If
the enclosures are kept apart the communication cables can be run in conduits (if applicable).
See Install the interconnection plates.
The routing of cables between the UPSs can be done in three different ways.
1. UPSs apart (without conduits)
2. UPSs bolted together (using interconnection plates/baying kit)
3. UPSs apart (using conduits).
Page view 4
1 2 3 4 5 6 7 8 9 10 ... 23 24

Comments to this Manuals

No comments