APC Smart-UPS Specifications Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
Smart-UPS X-Series Operation4
Operation
Connect Equipment to the UPS
Note: The UPS will charge to 90% capacity in the first three hours of normal operation. Do
not expect full battery runtime capability during this initial charge period.
1. Connect equipment to the outlets on the rear panel of the UPS.
2. Connect the UPS to the building utility power. Connect the UPS to a two-pole, three-wire,
grounded source only.
3. Press the
ON/OFF button on the front panel of the UPS to power the unit and all connected
equipment.
4. To use the UPS as a master on/off switch, turn on all the equipment that is connected to the UPS.
See “Controllable Outlet Groups” on page 10 for information on how to use the Controllable
Outlet Groups.
Basic Connections
Serial port: Connect to a computer to use power management software.
USB port: Connect to a computer to use power management software.
External Battery Pack connector: Connect external battery packs to provide
extended runtime during power outages. The UPS can support up to five external
battery packs.
su0439a
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 27 28

Comments to this Manuals

No comments