47EcoBreeze System Operation and Maintenance
Inspecting the Heat Exchangers. Inspect heat exchangers Module by Module. Remove power
from the Module to be inspected. Be certain that the branch circuit feeding the Module is turned
off. Open the access panels. Remove one section of mist eliminators from the upper portion of
the Module. Inspect the top of the heat exchangers for buildup of mineral deposits, dirt, or
microbial contamination. If any evidence of contamination is found, the IEC core may need to
be removed to perform a thorough inspection of the IEC core tubes. If additional contamination
is found on the IEC core tubes, the water collectors should be cleaned.
Water pulse power treatment system. Inspect the AC power supply for visible damage that
might affect water treatment system safety and operation. This visible inspection should ensure
that no wires have been cut or are exposed.
Inspect the umbilical cable for visible damage that might affect the safety and operation
of the water treatment system. This visual inspection should ensure that no wires have
been cut or are exposed.
Inspect the umbilical cable connectors at both the signal generator and treatment Module
umbilical cable for corroded or damaged pins.
Inspect the treatment Module ventilation ports to verify that they are clear.
Inspect the signal generator to ensure that it is firmly secured.
Inspect the signal generator fan filters and ventilation exhaust/filter to verify that they are
clear.
Cleaning: In a dusty environment, the ventilation filters of the signal generator and the
ventilation ports on the treatment Module may need to be periodically cleaned. If for any
reason the outward surface of the signal generator requires cleaning, clean the outside
surface with a damp, clean cloth. Wipe clean with a soft cloth. Let it air dry.
Electrical
Check the electrical panels and controls: Turn off the main disconnect on the control panel.
Make a general check for possible problems: frayed wires, loose relays, overheated
parts, loose terminal connections, etc.
The access door is secured with bolts to prevent unauthorized access. Replace the bolts
after installation or servicing. The control panel door has an electrical disconnect to shut
off power to the entire unit.
Check that the wires are color-coded or numbered at both ends and that the terminal
block connection points are numbered. These markings correspond with the electrical
diagram provided in the operating and maintenance manual.
Check for any signs of damage.
Check the location and mounting of the user interface. Check the operation of the display
and key pad.