42 InfraStruXure InRow RC—Operation and Maintenance
Semi-Annual Preventive Maintenance
* Perform all the Monthly/Quarterly Preventive Maintenance items and the items below.
Prepared By: _________________________________
Model Number: ______________________________
Serial Number: _______________________________
Date: _________________
Cleanliness
Cleaning the evaporator coil requires unlocking and removing the side panels. Before you
remove the side panels, you must shut off and lock out the power to the cooling unit.
Check the cleanliness of the evaporator coil. Clean if required.
Functional tests
Check the operation of all system alarms.